  • Project: Clyde Onshore Windfarm – Moffat / Biggar, Scotland

  • Value: £3m

  • Client: Hanson

  • Role: Sub Contractor

  • Overview:

    Access road construction for the largest onshore Wind Farm in Europe, with associated earthworks in upland environment for wind turbine base areas with ecological and archaeological considerations.

Scope of Works & Achievements

  • Construction of structure platforms, access roads and excavation of turbine bases, in preparation for the deliveries and construction of the wind turbines. 
  • Construction of approx. 12km of new access roads, for 29 turbine bases and 2 anemometer bases
  • Earthworks consisting of the movement of 350,000m³ of rock and 130,000m³ of peat
  • Installation and maintenance of temporary ground/surface water control measures
  • Remove all tree stumps from Track Alignment and Turbine Base areas
  • Install permanent drainage ditches in verges
  • Estimated quantity of crushed material produced - 74, 300 m³).