  • Project: Kings Dock Mill

  • Value: £1.2m

  • Client: Bowmer & Kirkland

  • Role: Sub Contractor

  • Overview:

    Major Remediation & Civils project part of the iconic Kings Dock / Liverpool Echo Arena Development Scheme, next to the Albert Dock.

Scope of Works & Achievements

  • Excavation to locate concrete piles, breaking down piles, fix formwork, steel and pour concrete ring beam, to the whole of the site area (160x30m)
  • 14,000m³ of bulk excavation of various categories of contaminated made ground in accordance with the D. Morgan PLC Site Waste Management Plan, based on the desk study undertaken at tender stage, from significant volume of SI data available.
  • Selected all brick rubble and concrete slabs from previously backfilled basements (demolition rubble)
  • Stockpiled, crushed and tested for re-use as pile-mat onsite in later phasing of works
  • Completed to the agreed programme and agreed costs
  • Forecast cost and programme to client staff weekly to manage additional works scope.
  • Completed without safety or environmental incident.
  • All materials double handled due to ACM’s anticipated. 
  • Excavations removal with validation of the extent of the Hotspot zone (hazardous disposal including arsenic and oil hydrocarbons)