  • Project: Notre Dame College - Liverpool

  • Value: £1.55m

  • Client: Willmott Dixon

  • Role: Sub Contractor

  • Overview:

    Full enabling package including Civils & Major Earthworks for a high profile new build college, replacing an iconic school, and acting as a catalyst for a major regeneration scheme.

Scope of Works & Achievements

  • Site Clearance (4,500m²)
  • Reduced Level dig – Excavation up to 4.00m deep (13,500m³)
  • Onsite Disposal – Landscaping (4,000m³) 
  • Inert Offsite Disposal (9,500m³)
  • Hazardous Offsite Disposal – Asbestos contaminated material (250m³)
  • Import of 6F2 capping – Piling Mat (4,500m³)
  • Drainage Works – 100 up to 450mm diameter runs Total 1,000m, 1200 – 1500 Manholes (20 Nr), Tubosider Attenuation Tanks, Land Drains (300m), Aco Channels (300m)
  • Ducting Works
  • Foundation Works – Pad Foundations
  • Kerbing & Edgings
  • Paving
  • Retaining Wall Works – 300m³ (4m high)
  • Ground Bearing Slabs
  • Filling to make up levels – Sub base