  • Project: Omega Phase 1 North - Infrastructure Works

  • Value: £4m

  • Client: Omega Warrington Ltd

  • Role: Principal Contractor

  • Overview:

    Site Infrastructure & Road Construction, for a £1.25 billion mixed use development, 240 ha former US Air Force base

Scope of Works & Achievements

  • Site establishment & Site clearance Bulk earthworks 
  • Traffic & Materials Management
  • Haul road to provide access to adjacent site
  • Spine Road Construction (including kerbs and gullies and manholes)
  • Improvement layer of formation (Import of sand fill / 1A Granular Fill from Bold Health - approx 10,000m3)
  • Blinding capping layer to protect formation (Import of 6F2 - approx 2,500m3)
  • Sub-base (Import of Type 1 MOT - approx 1,000m3)
  • Surface Course 50mm 8205m2, Binder Course 60mm 8218m2, Base Course 235mm 8230m2
  • Pedestrian and cycle lane construction (60mm binder, 20mm surface = 2560m2)
  • Extensive soft landscaping
  • Surface (approx. 280m of pipe runs) and Foul (approx. 600m of pipe runs) drainage installed
  • Drainage Swale & Attenuation ponds
  • Foul pumping and foul water drainage station
  • Service crossings underneath M62 Motorway
  • Secondary Substation (500kv)
  • On-site services including mains electricity, gas, water and telecommunications