D Morgan

News

Ellesmere Port U18 Girls Rugby Team11-Oct-2017

We, at D Morgan, strongly believe in supporting the Local Community and have a longstanding..

Staff Safety Awards19-Sep-2017

Two of our staff have recently received safety awards for their continued effort and support on ..

Smiths Dock Smiths Dock (567 KB)

  • Project: Smiths Dock – North Shiels, Newcastle-upon-Tyne

  • Value: £200,000

  • Client: Volker Stevin

  • Role: Sub Contractor

  • Overview:

    Major Earthworks & Cut to Fill operation using on site materials that have all been classified and deemed suitable to be used on site

Scope of Works & Achievements

  • Re-trim of existing batters with surplus clean clay material being placed 
  • Excavation of on-site b0rrow pit to generate clean clays
  • Cut to fill to bring to finished profile
  • Existing stockpiled material contained very high moisture content and needed to be aerated prior to final placement
  • Working close to water & existing dock concrete walls
  • Working close to edge’s with sheer faces into existing docks
  • Crossing of newly installed roads to get to work area.
  • Completed without Health and Safety, Environment or third party issue