  • Project: Royal Ordnance Factory, Chorley

  • Value: £13m

  • Client: BAE Systems

  • Overview:

    Demolition, remediation and infrastructure at ROF Chorley former MOD munitions site, the largest in Europe.

Scope of works included:

  • Demolition and processing 1.0million m³ of building and underground foundations for re-use
  • Bulk earthworks cut to fill and careful selection and re-use of 2.0million m³of materials. 
  • Construction of 7.3km of highways to adoptable standards including associated drainage and attenuation. 
  • Remodelled the site to manage the earthworks balance, including integration of SI and trial pit detail, and determining earthworks classification to ensure best use of all site materials
  • Implemented Value Engineering services at all times
  • Works phases were reviewed and changed with the client and design team, thus providing considerable savings for the client
  • Removing over 5million tonnes of earth dealing with buried munitions.
  • Breaking out 2million tonnes of heavily reinforced underground concrete structures and bunkers