  • Project: Blackley (Manchester) Site Regeneration Works

  • Value: £5m+

  • Client: Harrow Estates

  • Overview:

    Demolition, removal of hazardous waste, & bio remediation including carbon filter liquids remediation

Scope of Works

  • Bulk earthworks and major re-profiling soil stabilization
  • Crushing/recycling, & imported capping 
  • Associated chemical, geotechnical and site waste and environmental management
  • De-watering and deep drainage concluding with 0.75km of highway to adoptable standard
  • Construction of surface water runoff drains to intercept & divert surface water from slope
  • River works & Bridge abutment repairs
  • Retaining walls to the River Irk were removed creating naturalised riverbanks and seasonal wetland areas as part of a flood mitigation scheme providing aquatic habitat with much improved landscape and amenity value
  • Successfully removed Carbon Disulphide in discrete layers to temporary storage as an urgent H & S & flood protection measure
  • Materials remediated under water, carbon filtered & blended with a pre designed flash point reducing material
  • Site successfully inspected by HSE & the EA due to complex nature of scheme