D Morgan

News

PROPERTY TO LET - PRENTON24-May-2018

TO LET UNIT 1A & 1B (16 & 18) BADGER WAY NORTH CHESHIRE TRADING ESTATE PRENT..

Radio City Mission Christmas Toy Appeal14-Dec-2017

Every year, across Liverpool, Radio City holds Mission Christmas which raises awareness of..

D Morgan
  • Project: Kings Dock Mill Liverpool

  • Value: £1.2m

  • Client: Bowmer & Kirkland

  • Overview:

    Major civils scheme for a residential project, project part of the iconic Kings Dock / Liverpool Echo Arena Development Scheme, next to the Albert Dock – largest single collection of Grade 1 listed buildings in England.

Scope of works included:

  • Excavation to locate concrete piles, breaking down piles, fix formwork, steel and pour concrete ring beam, to the whole of the site area (160x30m)
  • 14,000m³ of bulk excavation of various categories of contaminated made 
  • Selected all brick rubble and concrete slabs from previously backfilled basements (demolition rubble)
  • Stockpiled, crushed and tested for re-use as pile-mat onsite in later phasing of works
  • Zero environmental incidents (sensitive brownfield site/former landfill, extreme care taken not to damage or break ‘seal’ over existing landfill)
  • All materials double handled with asbestos contaminated materials anticipated would be found on site.
  • Excavations removal with validation of the extent of the Hotspot zone (hazardous disposal including arsenic and oil hydrocarbons)
  • Non Hazardous was split into with and without asbestos contamination.