  • Project: Clyde Onshore Windfarm

  • Value: £5m

  • Client: Hanson / SSE

  • Overview:

    Access road construction for Europe’s largest onshore wind farm, with associated earthworks in upland environment for wind turbine bases, located in areas with ecological and archaeological constraints.

Scope of works included:

  • Construction of structure platforms, access roads and excavation of turbine bases, in preparation for the deliveries and construction of the wind turbines. 
  • Construction of approx. 12km of new access roads, for 29 turbine bases and 2 anemometer bases
  • Earthworks consisting of the movement of 350,000m³ of rock and 130,000m³ of peat
  • Installation and maintenance of temporary ground/surface water control measures
  • Remove all tree stumps from track alignment and turbine base areas
  • Install permanent drainage ditches in verges
  • Estimated quantity of crushed material produced - 74, 300 m³.